Building Services
Welcome. If you are looking for multi discipline turn-key projects, or smaller projects who better to trust than Mark Finn Laboratory Installations. We offer you total management of the whole process from the manufacture of all your laboratory furniture, its delivery to site and complete site management for its installation, all fully compliant with current Health and Safety legislation.
Before considering your preferred contractor for your proposed laboratory contract can we remind you that Mark Finn Laboratory Installations only use our directly employed Joiners, Plumbers, Electricians, Medical gas engineers and Site Managers or specialist personnel known to the company. We offer our own labour when and where it is needed to ensure that your contract will run as smoothly and seamlessly as possible. For more information call 01535 630776 or fax your details on 01535 630827 or email Mark Finn.
Site management – in house
By utilising our in house staff you will benefit from over 70 years of personal Laboratory construction and Laboratory installations experience. It will free up your management staff to carry on with their normal duties. The disruption to your normal working practices will be minimal.
To help you realise the laboratory you are planning email Mark Finn with your initial ideas, layouts and plans to start the process.
Since completing our first laboratory contract in 1978 we have a continuous record of new Laboratory creation and Laboratory refurbishment experience. Mark Finn Laboratory Installations offers -
- Complete manufacture of laboratory furniture
- Installation of laboratory furniture and equipment
- Complete manufacture of fume cupboards and extraction hoods
- Fume cupboard installation
- Builders works
- Complete estimation and design service
- Full CDM and Health & Safety planning and supervision
- Complete site management
- Laboratory Cold water systems
- Laboratory Hot water systems
- Laboratory Natural gas systems
- Laboratory Medical gas systems
- Industrial gas systems
- Galvanised bottle cage and bottle rack (manufacture)
- Laboratory Chemical resistant drainage systems
- Full & comprehensive electrical installation service
- Air conditioning
- Refrigeration systems
- Structural building works
- Wall cladding
- Laboratory Suspended ceiling
- Laboratory Partitioning
- Laboratory Decoration systems
- Clean room Vinyl walls and ceilings
Laboratory Flooring Systems
- Vinyl flooring
- Quarry tiling (floors & tops)
- Liquid bund areas
All our trades men, Joiners, Plumbers, Electricians, Floor Layers, Decorators are time served apprentice trained, all are City & Guilds Advanced approved operatives in their own speciality trades.
Site management and foremen are all experienced tradesman that have undertaken further training in Management, Health & Safety, Construction Design Management (CDM).
Mark Finn Laboratory Installations carry Ten Million Pounds insurance indemnity at all times as the norm, but extra insurance can be obtained if required.
Mark Finn Laboratory Installations is proud to be associated with the following professional bodies.
Please download our latest brochure for further details.
|
|
|
|
|
|
|
Federation Master Builders |
Institute of Health Engineers |
Corgi Consumer |
North West Consortium of NHS Trusts |
Royal Society for the Promotion of Health |
|
|